Farmington River Report 1/8/21: Fun with long-leader jigged streamers

Every once in a while I need a new project. Since I’ve been on a streamer kick, this seemed like a capital idea: try fishing small jig streamers on a long leader. This video featuring Lance Egan had piqued my interest. The point is not to cover vast stretches of river, but rather to work in close and target likely holding areas, tempting trout with a protein payoff. I’d fished in a similar manner for smallmouth on the Hous, bouncing dumbbell eyed streamers or larger jig streamers (like Barr’s Meat Whistle) along the bottom, but I wanted to try the longer leader thing with a smaller bug.

I reached out to fly fisher extraordinaire Devin Olsen for a quick leader formula. He suggested a basic construct like the one in his book Tactical Fly Fishing: 12 feet of 15# or 20# Maxima, 3 feet of 12# Amnesia, 18″ of 0.012 sighter material, tippet ring, then 6′-10′ of 4x or 5x tippet. I kept fly selection simple with this basic black and silver jig streamer, tied on a size 8 hook. Total length is about 2″.

So I hit the water. The winter crowds continue to astonish. I saw more anglers out yesterday than I do during an entire previous typical winter. I stayed within the Permanent TMA, with was running cold and clear at 450cfs. I shared the first mark with four other anglers; I blanked, and the only trout I saw taken came on bait.

I scored a lovely mid-teens wild brown in Spot B. This fish hammered the fly on the drop. This is a video still so the shot really doesn’t do the fish justice. I thought I had a trophy brown in Spot C, but two-thirds through the fight I could tell that something wasn’t quite right. My suspicions were confirmed when I netted a large sucker, foul-hooked in a pectoral fin.

The last two marks I hit were also blanks, but I counted the day as an unequivocal success. I’ll be working on this technique some more this winter, and will also be using it at times for smallmouth. It’s certainly best for in-close work, not only in terms of presentation, but casting as well. (The rig is an absolute bitch to cast; you’re not so much casting as you are lifting, loading, and lobbing.)

6 comments on “Farmington River Report 1/8/21: Fun with long-leader jigged streamers”

  1. […] the winter. I tried several techniques, each to match the conditions and marks I was fishing: tight/long line micro jig streamer, tight line drop shot nymphing, and then indicator […]

  2. […] than the previous two pools, and with a well-defined slot I made the decision to switch to the long-leader jigged mini-streamer. Slow going, but I was rewarded with a fat stocker rainbow on my last cast. And that, I thought, is […]

  3. […] to be good. I still don’t Euro nymph, but I did spend some time tying and learning to fish long-leader jigged mini-streamers. It’s an effective tactic for close-in work. Here’s the […]

  4. […] and found willing fresh stockees in all of them. Toby fished a streamer and I went with a small jig streamer on a long leader. I dead drifted, swung, stripped and jigged and caught fish all four ways. We saw caddis and midges […]

  5. […] numbers, mostly rainbows with a few browns and one brookie in the mix. The method was a long leader with a jig mini-streamer. The water was cold, 49 degrees, and a great height, 540cfs. Lots of caddis and midges out, and a […]

  6. […] to come up to a wet, let’s try to get them deep. I clipped the Iso fly off point, and added a black and silver mini jig streamer. Voila! We also banged up a decent smallmouth. Way to hang in there, Anthony, and we’ll get […]

Leave a Reply